Grid capacity and charging equipment
Utility-side upgrades need to be planned for at fleet charging locations early in the conversion process. Consult with your local electric utility and electrical engineers to ensure that all power requirements can be met. Sharing projected electric load growth based on BEV implementation plans with the utility will allow for synchronized upgrades.